The work consisted of repairing a section of the Gordon Way path at Heather Brig where there was significant erosion caused by water running down the path during periods of heavy rain. A new cross drain was installed at the top of the slop to divert the water, preventing future erosion. Then they filled in the eroded section of the path. A big thank you to Helen from Forestry & Land Scotland for transporting the material that was required to the site location.  

For more news please see our current News, News 2019 and Events sections.

Cross Drain
Erosin Infill